CVE-2022-48921
Essential information
- Published
- 22/08/2024 02:15
- Modified
- 12/09/2024 12:58
- Author
- —
- Creator
- —
- CVSS
- 4.7 MEDIUM (v3.1)
- CISA KEV
- No
- CWE
- —
- CVSS vector
-
—
CVSS:3.1/AV:L/AC:H/PR:L/UI:N/S:U/C:N/I:N/A:H—
CVSS metrics
- Access vector
- —
- Access complexity
- —
- Authentication
- —
- Confidentiality impact
- —
- Integrity impact
- —
- Availability impact
- —
- Exploitability
- —
- Remediation level
- —
- Report confidence
- —
- Temporal score
- —
- Attack vector
- LOCAL
- Attack complexity
- HIGH
- Privileges required
- LOW
- User interaction
- NONE
- Scope
- UNCHANGED
- Confidentiality impact
- NONE
- Integrity impact
- NONE
- Availability impact
- HIGH
- Exploit code maturity
- —
- Remediation level
- —
- Report confidence
- —
- Temporal score
- —
- Attack vector
- —
- Attack complexity
- —
- Attack requirements
- —
- Privileges required
- —
- User interaction
- —
- Confidentiality (V)
- —
- Confidentiality (S)
- —
- Integrity (V)
- —
- Integrity (S)
- —
- Availability (V)
- —
- Availability (S)
- —
- Exploit maturity
- —
Description
In the Linux kernel, the following vulnerability has been resolved:
sched/fair: Fix fault in reweight_entity
Syzbot found a GPF in reweight_entity. This has been bisected to
commit 4ef0c5c6b5ba ("kernel/sched: Fix sched_fork() access an invalid
sched_task_group")
There is a race between sched_post_fork() and setpriority(PRIO_PGRP)
within a thread group that causes a null-ptr-deref in
reweight_entity() in CFS. The scenario is that the main process spawns
number of new threads, which then call setpriority(PRIO_PGRP, 0, -20),
wait, and exit. For each of the new threads the copy_process() gets
invoked, which adds the new task_struct and calls sched_post_fork()
for it.
In the above scenario there is a possibility that
setpriority(PRIO_PGRP) and set_one_prio() will be called for a thread
in the group that is just being created by copy_process(), and for
which the sched_post_fork() has not been executed yet. This will
trigger a null pointer dereference in reweight_entity(), as it will
try to access the run queue pointer, which hasn't been set.
Before the mentioned change the cfs_rq pointer for the task has been
set in sched_fork(), which is called much earlier in copy_process(),
before the new task is added to the thread_group. Now it is done in
the sched_post_fork(), which is called after that. To fix the issue
the remove the update_load param from the update_load param() function
and call reweight_task() only if the task flag doesn't have the
TASK_NEW flag set.
NVD status
- Status
- Analyzed — CVE has been recently published to the CVE List and has been received by the NVD.
- Source
- 416baaa9-dc9f-4396-8d5f-8c081fb06d67
- NVD
- View on NVD
Affected products (CPE)
| Product | CPE |
|---|---|
| linux / linux kernel | cpe:2.3:o:linux:linux_kernel:*:*:*:*:*:*:*:* |
| linux / linux kernel | cpe:2.3:o:linux:linux_kernel:*:*:*:*:*:*:*:* |
| linux / linux kernel | cpe:2.3:o:linux:linux_kernel:*:*:*:*:*:*:*:* |
| linux / linux kernel | cpe:2.3:o:linux:linux_kernel:*:*:*:*:*:*:*:* |
| linux / linux kernel | cpe:2.3:o:linux:linux_kernel:5.17:rc1:*:*:*:*:*:* |
| linux / linux kernel | cpe:2.3:o:linux:linux_kernel:5.17:rc2:*:*:*:*:*:* |
| linux / linux kernel | cpe:2.3:o:linux:linux_kernel:5.17:rc3:*:*:*:*:*:* |