CVE-2025-10881
Essential information
- Published
- 16/12/2025 00:15
- Modified
- 19/12/2025 14:40
- Author
- —
- Creator
- —
- CVSS
- 7.8 HIGH (v3.1)
- CISA KEV
- No
- CWE
- —
- CVSS vector
-
—
CVSS:3.1/AV:L/AC:L/PR:N/UI:R/S:U/C:H/I:H/A:H—
CVSS metrics
- Access vector
- —
- Access complexity
- —
- Authentication
- —
- Confidentiality impact
- —
- Integrity impact
- —
- Availability impact
- —
- Exploitability
- —
- Remediation level
- —
- Report confidence
- —
- Temporal score
- —
- Attack vector
- LOCAL
- Attack complexity
- LOW
- Privileges required
- NONE
- User interaction
- REQUIRED
- Scope
- UNCHANGED
- Confidentiality impact
- HIGH
- Integrity impact
- HIGH
- Availability impact
- HIGH
- Exploit code maturity
- —
- Remediation level
- —
- Report confidence
- —
- Temporal score
- —
- Attack vector
- —
- Attack complexity
- —
- Attack requirements
- —
- Privileges required
- —
- User interaction
- —
- Confidentiality (V)
- —
- Confidentiality (S)
- —
- Integrity (V)
- —
- Integrity (S)
- —
- Availability (V)
- —
- Availability (S)
- —
- Exploit maturity
- —
Description
A maliciously crafted CATPRODUCT file, when parsed through certain Autodesk products, can force a Heap-Based Overflow vulnerability. A malicious actor can leverage this vulnerability to cause a crash, read sensitive data, or execute arbitrary code in the context of the current process.
NVD status
- Status
- Analyzed — CVE has been recently published to the CVE List and has been received by the NVD.
- Source
- [email protected]
- NVD
- View on NVD
Affected products (CPE)
| Product | CPE |
|---|---|
| autodesk / shared components | cpe:2.3:a:autodesk:shared_components:*:*:*:*:*:*:*:* |
| autodesk / 3ds max | cpe:2.3:a:autodesk:3ds_max:2026:*:*:*:*:*:*:* |
| autodesk / advance steel | cpe:2.3:a:autodesk:advance_steel:2026:*:*:*:*:*:*:* |
| autodesk / autocad | cpe:2.3:a:autodesk:autocad:2026:*:*:*:*:*:*:* |
| autodesk / autocad architecture | cpe:2.3:a:autodesk:autocad_architecture:2026:*:*:*:*:*:*:* |
| autodesk / autocad electrical | cpe:2.3:a:autodesk:autocad_electrical:2026:*:*:*:*:*:*:* |
| autodesk / autocad map 3d | cpe:2.3:a:autodesk:autocad_map_3d:2026:*:*:*:*:*:*:* |
| autodesk / autocad mechanical | cpe:2.3:a:autodesk:autocad_mechanical:2026:*:*:*:*:*:*:* |
| autodesk / autocad mep | cpe:2.3:a:autodesk:autocad_mep:2026:*:*:*:*:*:*:* |
| autodesk / autocad plant 3d | cpe:2.3:a:autodesk:autocad_plant_3d:2026:*:*:*:*:*:*:* |
| autodesk / civil 3d | cpe:2.3:a:autodesk:civil_3d:2026:*:*:*:*:*:*:* |
| autodesk / infraworks | cpe:2.3:a:autodesk:infraworks:2026:-:*:*:*:*:*:* |
| autodesk / inventor | cpe:2.3:a:autodesk:inventor:2026:*:*:*:*:*:*:* |
| autodesk / revit | cpe:2.3:a:autodesk:revit:2026:*:*:*:*:*:*:* |
| autodesk / revit lt | cpe:2.3:a:autodesk:revit_lt:2026:*:*:*:*:*:*:* |
| autodesk / vault | cpe:2.3:a:autodesk:vault:2026:*:*:*:*:*:*:* |